logo BOBPIPE ENGINEERING(SHANGHAI)CO.,LTD.

QUOTATION
  • TALWANDI SABO POWER LIMITED

    Product:Stainless Steel Lined Pipe Time:2012 Year Transmission:Boiler Recycling Water Quantity:5.0 Km Specification:Φ325*(8+1)mm

  • China Power Investment Corporation(CHD)

    Product:Stainless Steel Lined Pipe Time:2009-2015 Year Transmission:Recycling Water Quantity:2.1 Km & 2.8 Km Specification:Φ325*(8+1.5) mm

  • China Power Investment Corporation(CHD)

    Product:Bi-metal lined Pipe Time:2014 Year Transmission:Boiler Recycling Water Quantity:5.0 Km Specification:Φ159-Φ219 mm

  • Luohe Power Plant Of CHD(CHD)

    Product:Stainless Steel Lined Pipe Time:2009 Year Transmission:Treating Water Quantity:2.1Km Specification:Φ273*(7+0.8) mm

  • China Huadian Corporation(CHD)

    Product:Stainless Steel Lined Pipe Time:2014 Year Transmission:Recycling Water Quantity:2.1Km Specification:Φ273 mm

  • Shandong Power Construction Group

    Product:Stainless Steel Lined Pipe Time:2010 Year Transmission:Boiler Recycling Water Quantity:2.0 Km Specification:Φ159*(4.5+0.8)mm


ABOUT US
Development
Case study
Scale diaplay
Certification
Sales network
PRODUCTS
Development
Case study
Scale diaplay
Certification
Sales network
CONTACT
+86 21 6111 9089
info@bobpipe.com
8th Floor, Area C, HIGH-TECH Building, No. 900 Yishan Road, Xuhui District, Shanghai, China, 200233
Receive inspirations and growing tips